Concrete Patios: Thickness, Joints, Finish and Cost

Installed cost$6–$14/ft² ($65–$151/m²)
Slab thickness4 in (100 mm) pedestrian
Concrete strength3,500 psi (24 MPa) minimum
Joint spacing10 ft max (3 m) each way

Concrete is the cheapest hard surface per square foot and the least forgiving of shortcuts. A correctly specified slab will outlast the house. A badly specified one cracks in the first winter and cannot be repaired invisibly.

The good news is that everything that matters is decided before the truck arrives: thickness, base, strength, reinforcement and joint layout.

What it costs

Installed concrete patio cost, 2026
Finish Cost per ft² 300 ft² patio
Plain, broom finish $6–$10 $1,800–$3,000
Exposed aggregate $8–$12 $2,400–$3,600
Coloured, integral $9–$13 $2,700–$3,900
Saw-cut decorative pattern $10–$14 $3,000–$4,200
Stamped and textured $12–$25 $3,600–$7,500

Costs assume a level site with reasonable truck access. Removing an existing slab adds $2–$4 per square foot.

The slab specification

Plan of a concrete patio showing control joints spaced at ten feet, with a section showing a four inch slab over four inches of compacted base
Control joints and slab thickness. Panels no larger than about 10 × 10 ft, joints cut to a quarter of the slab depth. Concrete will crack — the joints decide where.
Specification for a residential concrete patio
Element Pedestrian use With vehicle traffic
Slab thickness 4 in (100 mm) 5–6 in (125–150 mm)
Concrete strength 3,500 psi (24 MPa) 4,000 psi (28 MPa)
Base 4 in compacted 6 in compacted
Reinforcement Mesh or fibre Rebar grid
Control joints ≤ 10 ft spacing ≤ 10 ft spacing
Air entrainment 5–7% in cold climates 5–7% in cold climates

Air entrainment is a freeze-thaw requirement. It is invisible on the day and decisive in the third winter.

Why 4 in, and when to go thicker

Four inches is the point at which a slab can spread a normal foot or furniture load over the base without flexing. Go thicker where the load is concentrated or the base is unreliable:

  • Hot tubs — 5–6 in with a reinforced pad, and check the point load. A filled hot tub is several tonnes.
  • Vehicle access — 5–6 in with rebar.
  • Soft or expansive clay subgrade — 5 in with rebar, and more base.
  • Ride-on mower storage — 5 in. A stored mower is a vehicle load, not a furniture load.

Joints: the detail that decides everything

Concrete shrinks as it cures. If nothing controls that movement it relieves itself as a random crack. Control joints create a deliberate plane of weakness so the crack happens in a straight, planned line.

  1. Spacing — no panel larger than about 10 × 10 ft, and roughly square. Panels more than about 1.5:1 in aspect ratio crack across the narrow dimension.
  2. Depth — cut to roughly a quarter of the slab depth. On a 4 in slab that is 1 in.
  3. Timing — within about 12 hours of finishing, while the concrete is still green. Too late and it has already cracked.

Where the patio meets the house wall, use an isolation joint — a compressible filler that lets the slab move independently of the foundation. Concrete poured hard against a wall will crack along that line.

Finishes

Concrete patio finishes compared
Finish Slip resistance Maintenance Notes
Broom Good None Cheapest, functional
Exposed aggregate Very good Occasional seal Durable, textured
Coloured, integral Depends on texture Seal every 3–5 yrs Even colour throughout
Saw-cut pattern Good Seal every 3–5 yrs Faux stone look
Stamped Varies Seal every 2–3 yrs Widest design range

In wet or shaded areas, avoid smooth finishes. A polished or tightly trowelled surface is genuinely dangerous when wet.

Curing and first use

When you can use a new concrete patio
Activity Wait
Foot traffic 24–48 hours
Light furniture 7 days
Full design load 28 days
Sealing 28 days

Concrete reaches design strength at 28 days. It keeps gaining strength for years after, but 28 days is the specification point.

Curing matters as much as the mix. Concrete that dries too fast loses surface strength and dusts. Keep it damp for the first several days with a curing compound, plastic sheeting, or regular misting.

Common failures and what causes them

Cracks across the middle of a panel
Joints too far apart, or cut too late, or too shallow. This is the most common failure and it is a specification error, not bad luck.
Spalling and flaking at the surface
In cold climates, almost always missing or insufficient air entrainment. In warm climates, look for de-icing salt use or an over-wet mix.
Dusting
Poor curing, an over-trowelled surface, or too much water in the mix.
Uneven settlement
Base too thin or not compacted, or organic matter left in the subgrade.
Ponding water
Insufficient fall, or the slab has settled. Aim for 1–2% away from the building, with the surface at least 6 in below the damp-proof course.

Concrete or pavers?

Concrete wins on first cost and on a seamless, jointless appearance. Pavers win on repairability and on sites where the ground moves — a paver surface accommodates settlement unit by unit, where a slab cracks as a sheet.

Our paver build-up guide sets out the alternative in detail, and the stamped concrete guide covers decorative finishes and their resealing costs.

Frequently asked questions

How thick should a concrete patio be?

4 in (100 mm) over 4 in of compacted base is standard for foot traffic, at 3,500 psi minimum. Increase to 5–6 in with reinforcement for hot tubs, vehicle access or where the subgrade is soft.

How much does a concrete patio cost per square foot?

Plain concrete runs $6–$10 per square foot installed. Exposed aggregate, broom finish and coloured concrete run $8–$14. Stamped and decorative work starts around $12 and can exceed $18.

How often should control joints be cut?

Space them so no panel exceeds about 10 × 10 ft, and cut to roughly a quarter of the slab depth within 12 hours of finishing. Panels should be roughly square; long thin panels crack across the middle.

Does a concrete patio need rebar or mesh?

For a 4 in pedestrian slab on well-compacted base, welded wire mesh or fibre is commonly used and is adequate. Rebar adds value where the slab spans soft spots, carries vehicles, or sits on expansive clay.

How long before I can walk or build on a new concrete patio?

Foot traffic after 24–48 hours, light furniture after about 7 days, and full design load after 28 days. Sealing is usually done at 28 days once the slab has dried, not immediately after finishing.

Sources and references

  1. American Concrete Institute — ACI 332 residential concrete
  2. Portland Cement Association — residential concrete slabs
  3. Cement Concrete & Aggregates Australia — residential slabs and footings